Construction IT Services in Fort Worth

Construction IT services in Fort Worth cover jobsite connectivity on corridor work, field device management, support for Procore and Sage 300 CRE, cybersecurity, and the locate tickets and dig records your excavation liability rests on. Uprite supports Tarrant County contractors from our Dallas office at 5757 Alpha Road, roughly thirty miles east, with controls audited to SOC 2 Type 1 in 2023 and pricing published at $138 per user per month.

SOC 2 Type 1 audited in 2023. IT for general contractors, specialty trades, and the utility and heavy civil firms that make Tarrant County what it is. Built for a company whose job site moves a quarter mile a week.

Get Your Free Field and Dig Records Assessment
In Texas Since 1999  |  MSP 501 Winner 7 Years Running  |  SOC 2 Type 1 (2023)  |  120-Day Satisfaction Guarantee

Get Your Free Field and Dig Records Assessment

Recognized Across Texas for Construction and Heavy Civil IT

The Tarrant County Problem

The Job Site That Does Not Have an Address

Ask a Fort Worth contractor where the job is.

On a building job the answer is a street address. On a water line, a paving job, a fiber run, or a substation feed, the honest answer is a station number and a direction of travel. Work starts at one end of a corridor and finishes somewhere else weeks later, and the ground your crews are standing on today is not the ground they were standing on Monday.

That shape is not unusual here. It is the local economy. In 2025, Tarrant County employed 8,617 people in utility system construction across 143 establishments, an average of 60.3 per firm and the highest of the four largest counties in Texas. We calculated those figures from the Bureau of Labor Statistics Quarterly Census of Employment and Wages. Dallas County employed 6,269 in the same work, on a construction workforce more than half again as large. Heavy and civil engineering is one in five construction jobs in Tarrant County. In Dallas County it is closer to one in eight.

Nobody has ever called that an IT problem.

It is one.

Every assumption the technology industry makes about a job site assumes a building. A trailer with a wired circuit. An access point with a wall to mount on. A street address a carrier can find. None of it survives contact with a corridor, and the record keeping that rides on top of it is where contractors actually get hurt.

So when a managed IT provider in Fort Worth asks only about the office and the file server, they are covering the part of your company that sits still. The part that moves is where the schedule and the liability both live.

Tickets and the Dig Record

Forty-Eight Hours, Fourteen Days, and a Ticket Nobody Can Find

Here is the pattern. We find it in almost every utility and site contractor we open up.

Before anyone breaks ground in Texas, the dig has to be called in. Texas Utilities Code Section 251.151 requires notice to a notification center no earlier than the fourteenth day before excavation begins, and no later than the forty-eighth hour before it begins, excluding Saturdays, Sundays, and legal holidays. Two boundaries, not one. File late and you are in violation. File too far ahead and the ticket ages out before the machine reaches that station.

On a corridor that produces a rolling obligation tied to production rate.

Site foreman reviewing locate ticket records on a rugged tablet beside a marked utility trench in Fort Worth

A crew laying four hundred feet a day works through a fourteen-day window in a little over a mile. So the cadence has to track the schedule. That means somebody in the field is raising, renewing, and closing Texas811 tickets continuously, from a phone, frequently on one bar.

Then there is what the notice has to carry. Section 251.152 requires the excavator to supply a field telephone number and an email address or other electronic address approved by the board. That address is where the operator replies about what is buried and where. If it belongs to a superintendent who left in March, the operator answered and your company never received it.

Fixing it is unglamorous. Company-owned addresses on every ticket, one shared ticket log instead of six phones, photographs of the marks captured with location and time and synced off the device before the excavator moves, and an offboarding routine that actually reaches the ticketing accounts.

Uprite completed a SOC 2 Type 1 examination in 2023. An independent auditor tested our controls against the Trust Services Criteria for security, availability, and confidentiality. Then they wrote it up. That report is what we hand a public owner or an insurer asking how your dig records are held, instead of a page of assurances we wrote about ourselves.

What That Looks Like on a Fort Worth Corridor

A Ticket Log the Company Owns

Every active locate ticket with its station, its expiry date, and who raised it, held where the office and the field read the same list. Almost nobody has that today.

Addresses That Outlive the Crew

Ticket contacts and operator responses on company-controlled email and phone numbers, so a resignation does not quietly cut off answers you are legally entitled to receive.

Connectivity That Follows the Alignment

Coverage checked against the corridor before mobilization rather than against the trailer address, with bonded cellular and failover sized for the thinnest point on the route.

Field Capture That Leaves the Device

Photographs of marks, damage, and as-built conditions synced automatically with location and timestamp, instead of sitting on a phone until somebody remembers.

Copies Ransomware Cannot Reach

Immutable backup stored outside the domain, past the reach of any account that gets compromised. Restores get tested on a schedule. Not attempted for the first time in the week you need one.

Evidence Ready Before the Claim

Ticket numbers, operator responses, and dated photographs organized the way a damage investigation asks for them, so the file exists before anybody requests it.

One assumption shows up constantly. Contractors treat the locate ticket as a safety formality, which it is, and therefore as somebody else’s paperwork, which it is not. It is the document that decides who pays when a line gets hit.

The Risk

Your Liability Shield Is a Documentation State

One sentence in Texas law should change how a contractor thinks about record keeping.

Section 251.157(c) says an excavator who has fully complied with the chapter may not be liable for damage to an underground facility that was not marked in accordance with it. That is real protection. Read the condition attached to it.

Fully complied. Not intended to comply.

Compliance here is not a state of mind, it is a set of documents. The notice went in inside the window. It carried the required information. The address on it was one your company could actually receive mail at, because Section 251.157(d) requires an operator to tell you by email, facsimile, or another verifiable electronic means when it does not intend to mark. If that notice reached a mailbox nobody has opened since March, you did not receive it, and the file that proves you did everything right has a hole in the exact place that matters.

Meanwhile the other side keeps its own copy. Under Section 251.103 a notification center must maintain, for not less than four years, a record of your notice, the information you supplied, its contact with operators, and what it sent back to you. It may not destroy records relating to a matter it knows is in litigation. Your file is being compared against one that does not go missing.

Company Identity, Not Personal Email

Multi-factor authentication and conditional access across email, the project platform, remote access, and the ticketing accounts, with offboarding that runs the day somebody leaves rather than at the end of the job.

A Record That Outlives the Crew

Tickets, operator responses, dated photographs, and as-built markups held in a system you control, so a departure or a drowned phone does not become a gap in your evidence.

A Callback Rule Before Money Moves

Email authentication plus a written verification step before banking details change on a subcontractor payment. The rule is simple. Confirm it on a number you already had, even when the request arrives inside a real thread.

Answers That Exist Before the Bid

Owner questionnaires, insurance renewals, and public owner prequalification handled from documentation that already exists instead of assembled in the two weeks before a due date.

Full disclosure. We sell managed IT, so read the recommendations on this page with that in mind. The statutory deadlines, the retention period, and the county employment numbers are not ours. They come from the Texas Utilities Code and from the Bureau of Labor Statistics, and they apply to your company no matter who you end up hiring.

Coverage and Connectivity

A Corridor Is Not a Building

You cannot order a circuit to a station number.

That sounds obvious, and it quietly breaks most site IT plans. A carrier install needs a service address. A corridor has an easement. By the time the paperwork clears, the crew has moved past the demarcation point anyway, so the wired build is obsolete before anyone commissions it.

The target here is different. Coverage gets checked against the alignment rather than the trailer, and the kit is sized for the worst point on the route instead of the best one. Bonded cellular across more than one carrier does the work. Every site is built from the same package, so the fourteenth mobilization looks like the first and can be supported without a windshield.

Project engineer reviewing corridor drawings inside a Fort Worth utility contractor jobsite trailer beside a wall-mounted network cabinet

What We Support on Tarrant County Projects

Project Management Platforms

Procore, Autodesk Construction Cloud, BIM 360, and Buildertrend, including the integrations that push cost data back into accounting. Ask about anything not listed. The answer is usually yes.

Construction Accounting and ERP

Sage 300 Construction and Real Estate, plus Viewpoint Vista and Spectrum, together with the job cost, certified payroll, and AIA billing layered on them. Here is why a construction ERP needs a managed IT partner.

Heavy Civil and Field Systems

HCSS HeavyBid and HeavyJob, Trimble and Topcon machine control, GPS rovers, and the survey data that comes back off them. Large files, created in the field, impossible to re-create once the trench is closed.

Trailers, Yards, and Laydown

Trailer networking, bonded cellular, site wireless, and cameras, installed on the mobilization date and pulled on the demobilization date. The hardware follows the crew to the next corridor. Nobody buys it twice.

Field Devices and Rugged Hardware

Tablets and laptops enrolled in device management before they leave the yard, so a unit lost in a ditch gets wiped remotely rather than worried about.

Severe Weather Continuity

North Texas gets hail, straight-line wind, tornadoes, and the occasional week where the grid is the story. An open trench does not wait out a storm. Continuity planning runs through our Fort Worth disaster recovery practice.

Weather does not stop the clock either.

A locate ticket keeps aging while a trench stands full of water, and paint fades under traffic and rain whether or not anyone is working. Every re-mark is another request, another operator response, and another item that has to reach somebody who still works for you. On a job that has stood down for a week, the tickets are usually the first thing to expire and the last thing anybody checks.

A schedule does not pause because the ground did.

By the Numbers

The Numbers Behind Construction IT in Fort Worth

Two kinds of numbers belong on this page. What Tarrant County work and Texas law impose on a contractor here, and what Uprite is willing to publish. Both matter.

60.3

Workers per utility system construction firm in Tarrant County in 2025, the highest of the four largest counties in Texas, calculated from Bureau of Labor Statistics county data.

8,617

People employed in utility system construction in Tarrant County, against 6,269 in Dallas County, on a total construction workforce roughly a third smaller.

48th hour

The latest an excavator may notify a notification center before digging under Texas Utilities Code Section 251.151, and no earlier than the fourteenth day.

4 years

How long a notification center must keep the record of what you filed and what it sent back, under Texas Utilities Code Section 251.103.

$138

Per user per month for fully managed IT, printed here rather than revealed after a discovery call.

MetricData PointSource
Utility system construction workers per firm, Tarrant County, 202560.3 per establishment, highest of the four largest Texas countiesBLS Quarterly Census of Employment and Wages, author calculation
Utility system construction employment, Tarrant County against Dallas County8,617 against 6,269BLS Quarterly Census of Employment and Wages, 2025
Share of Tarrant County construction employment in heavy and civil engineering20.4 percent against 11.9 percentBLS Quarterly Census of Employment and Wages, author calculation
Latest notice to a notification center before excavation begins48th hour, and no earlier than the 14th dayTex. Util. Code Sec. 251.151
Operator deadline to mark, or to say in writing that it will not mark48th hour after notice, by verifiable electronic meansTex. Util. Code Sec. 251.157
Notification center record retentionNot less than 4 yearsTex. Util. Code Sec. 251.103
Civil penalty for a first violation of the notice, information, or damage rules$500 to $1,000, doubling on a repeat inside a yearTex. Util. Code Sec. 251.201
Average annual pay, Tarrant County construction, 2025$90,135BLS Quarterly Census of Employment and Wages, 2025
Uprite published starting price$138 per user/monthUprite BUILD Complete℠
Uprite satisfaction guarantee120 daysUprite service agreement

Tell us where the corridors are and what the trailers are running on.

We will map the coverage and the dig records before you commit to anything.

Book the Assessment

Getting Started

How We Onboard a Tarrant County Contractor

The sequence is built around live jobs. Nothing waits. Nothing in it asks a crew to stand down or a trench to stay open.

Step 1. Inventory the Records, Not Just the Assets

Yards, trailers, field devices, and the part almost nobody has written down: every locate ticket account, operator contact address, owner platform, and permit system your active work depends on, with the address each one is registered to and the person who actually holds it.

Step 2. Business Technology Assessment

The inventory becomes a prioritized plan, ranked by what threatens a date or a claim rather than by what is fastest to bill. An estimating workstation with no backup goes in week one. So does a ticket contact address nobody can log into.

Step 3. Move Identity Off Personal Email

Company-owned accounts, multi-factor on managed devices, conditional access, and an offboarding routine that reaches the ticketing and portal accounts. This goes ahead of everything else because it is where contractor incidents and missing evidence start.

Step 4. Build One Site Kit and Reuse It

Corridor connectivity, failover, site wireless, cameras, and device enrollment standardized into one repeatable package, so mobilizing in Mansfield and mobilizing in Azle are the same job. The 120-day satisfaction guarantee covers the transition.

Step 5. Run It, Test the Restore, Keep the Answers Current

Around-the-clock monitoring, a help desk that answers a foreman as fast as it answers the office, restore testing on a schedule, and security documentation kept current for the next owner questionnaire.

Three to six weeks covers the first three steps for most contractors. A twenty-five person site contractor on Procore and Microsoft 365 moves a good deal faster than a two-hundred-person firm running Vista on an on-premise server. We will tell you which one you are before you sign anything.

Honest Fit Check

Who Uprite BUILD℠ Is Built For

Right fit
General contractors, specialty trades, and utility and heavy civil firms across Tarrant County with 15 to 300 users and work running in more than one jurisdiction
Companies where the office and the field have to be looking at the same Procore, Sage, Viewpoint, Bluebeam, or HCSS data on the same day
Excavation and site contractors whose locate tickets, marks, and as-built photographs currently live on personal phones
Anyone who has lost days, or a damage claim, to a record that turned out to live with somebody who no longer works there

A contract that should never have been signed helps nobody. If none of this sounds like your company, say so on the first call. We will point you at somebody who fits better.

Before You Switch

What Actually Stops Tarrant County Contractors From Switching

Four objections come up in almost every first conversation. Here they are, answered straight.

“Our work runs from Azle to Mansfield. Nobody can cover that.”

Nobody should. Driving is not the model. Monitoring, patching, identity, backup, and device management are all delivered remotely, and standardized site kits mean a spread in Weatherford is supported exactly like one in Arlington. Engineers come out for mobilization, demobilization, and the things that genuinely need hands.

“The ticket accounts are all in one person’s name.”

Very common, and fixable without interrupting an open dig. We inventory what exists, move contact addresses onto company-controlled accounts one operator at a time, and document which jurisdictions and utilities each one covers.

“We already employ somebody who handles IT.”

That is the usual case, and Uprite BUILD Impact℠ exists for it. Your person keeps the relationships and the institutional knowledge, and stops being the only one reachable when a site drops off the network at six in the morning. Co-managed IT in Fort Worth runs $100 per user per month.

“A bid is due in three weeks and the owner sent a security questionnaire.”

We get that call regularly. Usually in exactly that window. We work through the questionnaire with you, document the controls that already exist, mark the ones that do not with a date rather than a promise, and give you something defensible to submit on time.

Definition

Construction IT Services in Fort Worth, Defined

Construction IT services in Fort Worth means managed technology built around the way a contractor actually operates rather than around a generic office: jobsite connectivity and trailer networking, field device management, support for Procore, Autodesk Construction Cloud, Sage 300 CRE, Viewpoint, Bluebeam Revu, and HCSS, governed access to the locate ticket and permit accounts every excavation depends on, cybersecurity scoped to a workforce that turns over with each job, and backup and recovery planned around dates that do not move. Uprite delivers it through the Uprite BUILD℠ framework across Tarrant County and the western Metroplex, including Fort Worth, Arlington, Mansfield, Grapevine, Euless, Bedford, Hurst, North Richland Hills, Keller, Haltom City, Saginaw, Azle, Burleson, Crowley, and out to Weatherford.

Three Things That Set Uprite Apart for Tarrant County Contractors

Uprite BUILD℠, Four Ways

Complete, rComplete, Impact, and Secure. Fully managed, remote-managed, co-managed next to the person already on your payroll, or compliance and vCISO cover for the point where owner security requirements outgrow the rest.

The Price Is on the Page

$138 per user per month fully managed, $100 co-managed, and $40 for security augmentation, with a year-one rate lock and no fees that appear in month seven. A contractor comparing three proposals should not have to sit through a discovery call to learn the first number.

A North Texas Office and Engineers Who Drive

Uprite does not keep a Fort Worth office. Our North Texas office sits at 5757 Alpha Road, Suite 530 in Dallas, roughly thirty miles east of downtown Fort Worth, which puts an engineer on a Tarrant County site the same day. Most of it runs remote. Some of it still needs a person in the trailer.

What Clients Say

What Texas Contractors Say About Working With Uprite

★★★★★4.8Houston · 62 reviews★★★★★4.9San Antonio · 43 reviews
★★★★★

Hector and Kareem are super helpful! They are always willing to take on my computer problems even if its small. I had my mouse disappear off my screen, it was an user issue but Hector didn't make me feel small or "dumb" for this error. We love uprite!

Starla Lawhon -DyerGoogle review · Houston
★★★★★

Gerardo Sanchez was very helpful & professional. Uprite Services has great customer service and outstanding technicians. We have used them for several years and will continue our business with them.

Belle CardenasGoogle review · San Antonio
★★★★★

I had been having trouble with an IT matter that I didn't think would be fixed but Arvin Ebueng from Upright took his time with me and worked with me until we were able to resolve the issue. The issue was an internal issue with the way the program was written, but Arvin came up with a great work around so that I am now able to do what I need to do at my job. Long story short, he got me access to both things that I need access to simultaneously and daily. Thanks 😊 Arvin, you are much appreciated 👏 💐 🥳.

Sheila SpencerGoogle review · Houston
★★★★★

I’ve been extremely satisfied with Uprite Services and would recommend them without hesitation. They consistently deliver reliable, high-quality work and truly feel like a true partner rather than just another vendor. A special thank you goes to Arvin Ebueng, he is always quick to respond to our needs and incredibly easy to communicate with. No matter how busy things get, Arvin makes sure we’re taken care of promptly and with a smile. His responsiveness and clear communication have made every interaction smooth and stress-free. Thank you, Arvin and the entire Uprite team, Peerless Equipment is a customer for life!

james caswellGoogle review · San Antonio
★★★★★

I'm am not a "tech" person, however the team at Uprite gets me through the technological side of computers and software so that I can function on a daily basis... but the most enduring quality is that they care. Special shoot out to Mary, Sergio, Eufemio, Hector, and Jeff just to name a few... I appreciate each of you and the help you give me.

Evan HurleyGoogle review · Houston
★★★★★

Great service by Juan and Jacob. Always helping us out at Alamo City Trailer Sales. We have been using this company for over 10 years and always happy with the work they do.

Tess WhiteGoogle review · San Antonio

FAQ

What Fort Worth Contractors Ask First

What do construction IT services in Fort Worth include?

Jobsite and corridor connectivity, field device management, support for Procore, Sage 300 CRE, Viewpoint, Bluebeam, and HCSS, governed access to locate ticket and permit accounts, cybersecurity, and backup built for a workforce that is mostly not in an office. Uprite delivers it for $138 per user per month fully managed, with a 120-day satisfaction guarantee and controls audited to SOC 2 Type 1 in 2023.

Can you support jobs across Tarrant, Parker, Johnson, and Wise counties from one office?

Yes. Support runs remote first, and every site is built from one standardized kit. Monitoring, patching, identity, backup, and device management need no drive time at all. Engineers come out from our Dallas office at 5757 Alpha Road for mobilization, demobilization, and anything that genuinely needs hands on hardware.

Do you manage our locate ticket and permit accounts?

Yes. We inventory every ticketing and operator contact address your active digs depend on, move them onto company-controlled email and phone numbers, put multi-factor on managed devices, and add them to offboarding, so a departure does not cut off the operator responses Texas law entitles you to receive.

How much does construction IT support cost in Fort Worth?

Uprite publishes $138 per user per month for fully managed IT, $100 per user per month co-managed alongside your own IT staff, and $40 per user per month for security augmentation. Pricing carries a year-one rate lock. Field hardware such as trailer connectivity and rugged devices is quoted separately, because it varies with how many sites run at once.

What happens to our dig records if the person who raised the tickets leaves?

The records stay with the company, because tickets, operator responses, and dated photographs of marks are held in systems you control rather than on one person’s phone or personal email. Under Texas Utilities Code Section 251.103 the notification center keeps its own copy for at least four years, so the only real question in a damage dispute is whether your file is as good as theirs. See also IT compliance for Texas contractors.

Which construction and heavy civil software do you support?

Procore, Autodesk Construction Cloud, BIM 360, Buildertrend, Sage 300 Construction and Real Estate, Viewpoint Vista and Spectrum, Bluebeam Revu, AutoCAD, Revit, and HCSS HeavyBid and HeavyJob, along with Trimble and Topcon field data. Support covers workstation performance, file storage, integrations, and the field access that makes any of it usable.

Start Here

Find Out What Your Jobs Actually Depend On

Most contractors in this market have never had one complete picture of what their work runs on. Nobody planned it that way. Trailers were set up by whoever was free that week, tablets were bought for a job and never enrolled, and the ticket accounts were opened by whoever happened to be digging that month.

The assessment starts there. We inventory the sites, the devices, and the account access across every operator, jurisdiction, and platform your work touches, show you what is exposed and what is genuinely unrecoverable, and hand you the list whether or not you hire us.

A damage claim does not care who was holding the phone.

Your job site moves. Your records should not move with it.

Prefer the phone? Our Dallas office, which covers Fort Worth, answers at (469) 699-8766.